05.07.2009
The Reading power station situated in the north of Tel Aviv was established in 1938 by Pinhas Rutenberg. It is the third power station to be established in Israel. It currently has 2 x 214 MW turbines and consumes up to 90 thousand tons per hour of natural gas at maximum capacity

Phone:
Email: