05.07.2009
For an LNG project, 10 million cubic meters per day of production is universally seen as the minimum requirement to start an LNG project. When a discovery is made, it becomes necessary to decide on the optimal number of wells to be drilled to befit development costs and consumption needs of the market. On average each natural gas well can flow at a rate of about 75 MMscf/D

Phone:
Email: