05.07.2009

Landfall work requires connecting the incoming pipeline from offshore to the onshore pipeline.

Two methods are available: (i) Horizontal Directional Drilling (HDD) which involves drilling a hole through the landfall and, (ii) Cofferdam construction with dredging and sheet pile works.

Gina Cohen
Natural Gas Expert
Phone:
972-54-4203480
[contact-form-7 id="25054" title="Contact form 1"]