05.07.2009

Make a hole through the casing with a shaped charge of high explosives instead of a gun that fires projectiles. The loaded charges are lowered into the hole to the desired depth. Once detonated, the charges emit short, penetrating jets of high-velocity gases that cut holes in the casing and cement and some distance into the formation. Formation fluids then flow into the well bore through these perforations.

Gina Cohen
Natural Gas Expert
Phone:
972-54-4203480
[contact-form-7 id="25054" title="Contact form 1"]