24.11.2018
In these surveys one vessel tows the air gun array and the second main vessel tows the receiver array. This procedure takes place when there is a need to conduct a survey beneath platforms or other obstructions.
In these surveys one vessel tows the air gun array and the second main vessel tows the receiver array. This procedure takes place when there is a need to conduct a survey beneath platforms or other obstructions.