03.08.2009

Hoist (remove) the drill stem from the wellbore to perform one or more operations, such as changing bits, running a logging tool, or taking a core sample, and then return the drill stem to the wellbore

Gina Cohen
Natural Gas Expert
Phone:
972-54-4203480
[contact-form-7 id="25054" title="Contact form 1"]