It will be right and equitable to allow the application
Jacket; Jacket and topside; Installation of Jacket and Topside
The lower section or “legs” of an offshore platform. Platform underside structure fixed to the seabed using piles. These piles must be able to resist tension as the hydrodynamic forces on the structure have a tendency to cause overturning. Jacket and topside make the lower and upper parts of the platform. Platform installation Jackets and …
Continue reading “Jacket; Jacket and topside; Installation of Jacket and Topside”
Jointly and severally liable; Joint and several liability
This is a hybrid of “jointly liable” and “severally liable”. Namely, vis-?-vis the claimant each party is responsible for the full amount, but amongst themselves they have agreed to several liability, meaning that they can pursue the other party to pay their share of the liability
Landfall pipeline crossing; Landfall work location
Landfall work requires connecting the incoming pipeline from offshore to the onshore pipeline. Two methods are available: (i) Horizontal Directional Drilling (HDD) which involves drilling a hole through the landfall and, (ii) Cofferdam construction with dredging and sheet pile works.
Inperiod income tax allocation
Install a meter, install facilities
Installed capacity; Connected load; Installed electricity capacity; Installed capacity of power plants; Installed generation capacity; Gross installed capacity
The installed capacity of a power plant is either its nameplate capacity or its actual capacity. The total electricity installed capacity of a country is all the electricity capacity in place when all the plants are available for operation. The installed capacity of an electricity utility is required to meet all the electricity demands of …