05.07.2009
When offshore transmission pipe is laid in an s-curve from the back of a lay barge, pipe tensioners are employed to maintain the s-curve and avoid the pipe buckling on the sea floor
When offshore transmission pipe is laid in an s-curve from the back of a lay barge, pipe tensioners are employed to maintain the s-curve and avoid the pipe buckling on the sea floor