05.07.2009
For instance if a pipeline has the maximum capacity to transmit 16 billion cubic meters of gas per annum, it would be transmitting this full amount when said to be “operating at full capacity”. The economic worthiness of constructing a pipeline could be calculated based on an assumption that it would generate a 10% real IRR over a 20-year project life under the assumption that it would operate at full capacity throughout the year.

Phone:
Email: