03.07.2010
From the time of fabrication of a pipeline until its operation, it undergoes a number of tests. The first test is potentially the Factory Acceptance Test, which mostly consists of the inspection, testing and reporting of the system according to the drawings, specifications and requirements of the contract

Phone:
Email: