05.07.2009
A sudden increase in the rate of penetration during drilling. When this increase is significant – two or more times the normal speed – it may be due to a change in the formation, a change in the pore pressure of the formation fluids or both. It often means that the bit has drilled into sand (high-speed drilling) rather than shale (low-speed drilling)

Phone:
Email: