05.07.2009

This is the total possible capacity that can be produced from the operational production units in the system, according to their available capacity, within 24 hours. As per the Optimal Dispatch operational policy, it is customary to maintain around 1100 MW, which represent two large units. This reserve is taken into account in the optimization of the allocation of the production units for operation (for Israel)

Gina Cohen
Natural Gas Expert
Phone:
972-54-4203480
[contact-form-7 id="25054" title="Contact form 1"]