Established in 2001, adopting an effective action plan to organize and diligently handle the activities of the natural gas resources of Egypt, to encourage investment in the country’s natural gas sphere due to its importance to the economy of Egypt
The holder of a petroleum right shall furnish the Commissioner with samples of the rocks and fossils collected by him, but where a single sample is not capable of being divided, the holder of the petroleum right may keep it himself in his possession
Effective porosity – Porosity is a rock’s ability to store fluids within it. Effective porosity is the volume containable through the interconnected pores, and is usually less than total porosity. Thus, porosity alone is not enough to ensure that fluids can move through a rock structure. These pores must be interconnected in order to have any chance of a predicable reservoir
The engineering plan for constructing the wellbore. The program includes well geometries, casing programs, mud consideration, well control concerns, bit selections, offset well information, pore pressure estimation, economics, etc.
natural gas is considered to be dry when it is composed nearly entirely of methane. Gas that does not contain liquid hydro-carbons
The LNG chain spans from exploration, through processing and production, to downstream projects in liquefaction and distribution. The output of Train 1 is fully purchased by Gaz de France for 20 years and comprises 10% of France’s natural gas consumption; whereas the output of Train 2 is fully purchased by BG Gas Marketing
The holder of a petroleum right has the duty to inform the petroleum commissioner of any discovery made by him
A wellbore intentionally drilled at an angle from the vertical
Two lengths of pipe being welded together prior to being lowered into the firing line
