05.07.2009
The GSA will generally oblige the seller to deliver any quantity of gas nominated by the buyer, as long as nomination is between the minimum nomination level and the delivery capacity.. Seller will be relieved from this obligation only through FM
When a discovery is made, it becomes necessary to decide on the optimal number of wells to be drilled to befit development costs and consumption needs of the market. On average each natural gas well can flow at a rate of about between 75 MMscfD to even up to 150 mmscfd
