05.07.2009

Coal power station belonging to IEC situated in Hadera and situated on 1,200 dunam of land. One of the country’s two largest coal power stations with an installed capacity of 2,590 MW, which was constructed at a cost of $3 billion and which represents 25% of Israel’s installed generation capacity and is composed of two large coal stations. The plant however provides up to 35% of the country’s electricity needs due to the relative cheap cost of operating this coal power station. The station was graded as the most polluting station in the country and in fact is responsible for 42% of the country’s emissions of sulfur dioxide and nitrogen dioxide.

1st August 2011 – MNI Minister Landau ordered that 4 of the 6 turbines be converted to natural gas with coal as back up

A leading vertically integrated company dedicated to providing solutions for geothermal power, recovered energy generation (REG) and remote power. The company was established in 1965 by Yehuda and Yehudit Bronicki

This is the total resource base without regard to recoverability; it is essentially geologic in nature. The oil recovery factor (expected ultimate recovery divided by original oil-in-place) indicates what percent of the total resource can be recovered. Ultimately, the actual percentage recovered is significantly driven by complex economic and technological considerations.

505 to 440 million years ago