03.08.2009

Process for the reprocessing of spent nuclear fuel to separate uranium and plutonium from the fission products and from one another.

Seismic energy which has traveled partly as a P-wave and then as an S-wave; having been converted upon reflection at an interface.

Those standard practices, methods and procedures conforming to safety and legal requirements which are attained by exercising that degree of skill, diligence, prudence and foresight which would reasonably and ordinarily be expected from a skilled and experienced international operator of a power facility engaged in the same type of undertaking under the same or similar circumstances to those pertaining in (the country)

Receiving a permanent license is subordinate to reaching financial closure within a certain time frame, such as 18 months from the date of obtaining the provisional license