05.07.2009

A gate valve installed at the inlet (suction) side and the outlet (discharge) side of the pump station to isolate the pump station from the pipeline in the event of an emergency

The pressure measured in a well after the well has been closed in for a period of time, often after 24 or 72 hours. When a reservoir is first discovered, the static pressure equals the initial pressure. After production begins, the static pressure approaches the average reservoir pressure

A form of electrical charge that accumulates in an object due to friction between that object and another object. Whenever two objects produce static electricity from friction, both objects become charged, one negatively and the other positively

Procedure integrates reservoir properties including temperature, pressure, depth, and density to calculate pressure drop in wellbore