05.07.2009

Reduction coefficients in the form of reduced costs each year are often set for monopoly utilities in order to bring about greater efficiency reflecting the advantage of size

Transform or convert a current of high potential or pressure into one of low pressure, as a step-down transformer.

The cost of re-drilling a plugged well that was potentially abandoned because it was a marginal well could be as much as or even more than drilling a new well