10.06.2016

The thermal input required for converting to rated electrical capacity.

Operation of an electricity production system that was in shutdown mode.

Hot startup: up to 8 hours after shutdown, warm startup: 8-48 hours after shutdown, cold startup: more than 48 hours after shutdown.

An internal combustion electricity production system whose mixture of air and fuel is ignited by compression and used to operate production units, auxiliary facilities and in a state of emergency.

30.07.2015

Parabolic trough collectors which focus sunlight onto a special receiver

14.05.2015
27.04.2015
13.05.2014
28.01.2014
22.12.2013