19.08.2011
16.08.2011
09.08.2011
04.08.2011

See PDF file attached

October 2011 – The work on the pipeline from Tamar to Israel has started with the Allseas. This is a 150 km double line in which 12 bcm of natural gas can be transmitted. The gas will reach the production platform that will be constructed adjacent to the existing Mari-B platform. The platform is being constructed by Kiewit at a cost of $800 million

02.08.2011

Ellomay Capital, an energy company controlled by Shlomo Nehama, Ran Fridrich and Hami Rephael

27.07.2011

This is the action of enlarging a whole for drilling or for pipeline. One starts often with a small pilot whole which is easier and cheaper to do and makes it easier to ensure that the whole is directed properly. Then if a greater hole is needed, either in drilling operations because something went amiss and requires further and large casing, or simply because it is pre-planned to make small pilot whole when doing for instance horizontal drilling, the next step is called reaming and uses as ream to enlarge the size of the hole.
Pre-reaming operations are carried out to enlarge the drilled hole to a size suitable for accepting the product pipe. Pull-back pipe is added behind the reamer. Depending upon the pipe diameter to be installed several pre-reaming operations may be necessary, each progressively enlarging the hole.

20.07.2011