The super critic technology (higher temperature in the boilers and additional technological improvements) is more efficient by 3-7% than the critical technology that has a plant efficiency of about 39-43%.
Part of the capital costs actually incurred up to the date of reserves estimation minus depreciation and amortization expenses. Items such as exploration costs, land acquisition costs, and costs of financing can be included. A sunk cost is a cost that has already been incurred, and therefore cannot be avoided by any strategy going forward. The term refers to costs that have already been incurred and which cannot be reimbursed, such as a natural gas pipeline that has already been constructed becomes a sunken cost, because even if no gas flows through it the cost of the laying of the pipeline has been sunken or lost regardless. Sunk cost can represent the sum of all past costs incurred, including embedded costs and capital costs, but it does not include labor, rental, maintenance or other ongoing charges for things required in the present
Connects the port of Ain Shukna in the Gulf of Suez with the port of Sidi Kerir in the Med close to Alexandria. Its length is 320 km and consists of two 42″ pipelines that can transmit 125 million tons of oil per annum