05.07.2009
The Samsung Ceyhan (SCP) oil pipeline is due to be completed during 2009-2010. The pipeline is due to transmit CPC blend oil, as it passes via north Turkey southwards (ENI is the operator)
The Samsung Ceyhan (SCP) oil pipeline is due to be completed during 2009-2010. The pipeline is due to transmit CPC blend oil, as it passes via north Turkey southwards (ENI is the operator)