05.07.2009
Time during which a ship owner must give notice that a ship has arrived at the port of loading and is ready to load cargo
A barge that is specially equipped to lay submarine pipelines
Refers to the past 0.5-1.0 million years
Used in international crude oil trade. Can transport between 80,000 – 160,000 tons of crude oil
