Such as when shares boast an outperform recommendation and a target price many percentages higher than their current market value
Credit rating outlook of a company
The submerged lands extending from the outer limit of the historic territorial sea (typically three miles) to some undefined outer limit, usually a depth of 600 feet
A planned outage is the shutdown of a generating unit, transmission line, or other facility for inspection and maintenance, in accordance with an advance schedule. A forced outage is the unplanned loss of service of a generating unit, transmission line, or other facility for purposes other than inspection and maintenance
An ortophoto map is an aerial photograph which by metrical features completely corresponds to the map of the same scale. The procedure for producing ortophoto maps is faster thus more cost-effective than classical or digital maps. The production of an ortophoto map is based on oriented digital photogrammetric image and digital relief model. Once made there is no need to do it again, so producing maps with new images is very fast which enables continuous monitoring of special appearance and events. Such maps are especially suitable for infrastructure planning
Coal power station belonging to IEC situated in Hadera and situated on 1,200 dunam of land. One of the country’s two largest coal power stations with an installed capacity of 2,590 MW, which was constructed at a cost of $3 billion and which represents 25% of Israel’s installed generation capacity and is composed of two large coal stations. The plant however provides up to 35% of the country’s electricity needs due to the relative cheap cost of operating this coal power station. The station was graded as the most polluting station in the country and in fact is responsible for 42% of the country’s emissions of sulfur dioxide and nitrogen dioxide.
1st August 2011 – MNI Minister Landau ordered that 4 of the 6 turbines be converted to natural gas with coal as back up
A leading vertically integrated company dedicated to providing solutions for geothermal power, recovered energy generation (REG) and remote power. The company was established in 1965 by Yehuda and Yehudit Bronicki