Two LNG Terminals on the US Gulf coast. Freeport received FERC approval to begin operations in July 2008 and Sabine in August 2008
IEC Rutenberg A (installed capacity of 2 x 575 MW) & B (installed capacity of 2 x 550 MW) coal fired power station located in Ashkelon. The Rutenberg coal power station in Ashkelon requires 330 thousand liters of sea water per hour when it is working on full capacity. Thus, when such a station is working at full capacity for 13 days it requires more water than the annual production capacity of the Ashdod water desalination plant
The maximum amount of stress that a material can sustain without failure
The data entered on a run ticket is used to determine the volume of oil released from a storage tank or flowed through a meter
To connect pipe together and lower the connected length into the borehole in a controlled fashion